An $8,350 concreting job. He took a $3,350 deposit the same day, then didn't do a single day's work

Other languages: 中文 · Tiếng Việt · العربية

4-minute read · For anyone about to renovate, extend or hire someone who wants a deposit up front

2 September 2020, Greenslopes, on Brisbane's south side. A household wanted some concreting done, and the contractor quoted $8,350.

The quote went out that day, and the deposit was paid that day too: $3,350.

After that, he didn't do a single day's work, and he didn't give the deposit back. In the end the owners complained to the Queensland Building and Construction Commission (QBCC).

It took until 25 January 2024 for the Brisbane District Court to deal with it: a $15,000 fine, plus $3,350 in compensation to the owners. The judge also set a deadline: if he hadn't paid the owners by 24 July 2024, he'd have to come back to court and show why a three-month prison term shouldn't be enforced. According to the QBCC, he was the first person in Queensland to face possible jail under its escalating penalty system.

Whether he goes to jail is his problem. The number I want you to look at is a different one: under Queensland's rules, on an $8,350 job, the most a contractor can take as a deposit is $835.

What he took was roughly four times the limit.

$835Queensland: deposit limit on an $8,350 job
$3,350What he took the day he quoted

A deposit buys you a spot in the schedule, not half the job

A lot of people think of a deposit like this: pay half up front to show you're serious, and then the tradie will actually turn up.

That's only half right. A deposit does show you're serious, but the law puts a ceiling on it.

Each state government spells out its line clearly:

NSW: for residential building work, the deposit is capped at 10%, however big the contract.

Queensland: three tiers. Small jobs of $3,300 or less, up to 20%; $3,301 to $19,999, up to 10%; $20,000 and over, up to 5%. There's one exception: where more than half of the price is for work done away from the site, such as custom cabinetry, windows or sheds, the deposit can go up to 20%.

Victoria: contract price under $20,000, up to 10%; $20,000 or more, up to 5%.

I call this "money never runs ahead of the work": the deposit only gets you into the tradie's schedule. Every payment after that waits until the work has reached that stage.

A deposit buys you a spot in the schedule, not half the job.

Run the numbers on a $60,000 kitchen and bathroom renovation

Say you're doing a $60,000 kitchen-plus-bathroom renovation. By law, the most the contractor can take from you up front is:

NSW: 10%, $6,000.

Queensland: 5%, $3,000.

Victoria: 5%, $3,000.

$6,000NSW: deposit limit on a $60,000 job
$3,000Queensland and Victoria: deposit limit on the same job

If the contractor opens by asking for $20,000 or $30,000, "half up front for materials", that's no longer a negotiation over price. He's asking for money the law doesn't let him take.

You can see what other people's finished kitchen and bathroom renovations look like, and what they cost, on SeeBuilds: https://seebuilds.com/au/zh/works?category=kitchen_bath

An $8,350 concreting job. He took a $3,350 deposit the same day, then didn't do a single day's work · 1
Illustration: on a concreting job, the money should follow the progress, one stage at a time

The extra you paid isn't covered

Why does this line matter so much? Because when something goes wrong, insurance only recognises the legal amount.

In the QBCC's own words: if you pay more than the lawful deposit and later need to claim under the Queensland Home Warranty Scheme for a refund of your deposit, you won't be able to recover the excess you paid.

NSW has a different lock. Work over $20,000 must be covered by HBCF insurance. The NSW Government is clear: on work that needs this cover, the contractor can't ask you for a deposit, or any other payment, until the cover is in place and you've been given the certificate.

In Victoria the line is $16,000: above that amount, before taking a deposit, the builder must give you a copy of the domestic building insurance policy and the certificate of currency.

In one sentence: before you pay a deposit, see the insurance certificate. No certificate in your hand, not a cent.

After the deposit, the money follows the work

The deposit is only the first payment. All three states have rules for the progress payments that come after it too.

NSW: contracts over $20,000 must include a progress payment schedule, and progress payments must match the work actually done.

Queensland: progress payments must be in line with the amount of work completed. The QBCC's example: until at least half the work on site is done, the contractor can't claim half the contract price, and that half includes the deposit.

Victoria: for a contract that builds a house through every stage, the government sets the most you pay at each stage: base 10%, frame 15%, lock-up 35%, fixing 25%.

One more thing for readers in Victoria: on 11 September 2025, the Victorian Parliament passed new domestic building contract laws. In future, deposit limits and stage payments can be set in regulations, and the new laws take effect by 1 December 2026. Consumer Affairs Victoria's current position is that for now, the existing rules stay the same. Before you sign, check the official website for whatever applies at the time.

Why we're the ones most likely to pay too much at once

First, back home, paying a big chunk up front is normal. Plenty of renovation crews take thirty or fifty per cent before they start, and people are used to it. In Australia, paying that way is against the law.

Second, we're afraid the tradie won't turn up. Good tradies in Australia are booked out for a long time. When one says "pay half and I'll fit you in", a lot of people pay. The Greenslopes household paid the deposit, and what they got was not a single day's work.

Third, when someone comes recommended, it feels awkward to talk rules. Asking a friend's tradie "what's the legal maximum deposit?" can feel like you don't trust them. But the deposit cap is set by law. Asking isn't distrust; a properly licensed contractor is supposed to follow it anyway.

In a release this February, the QBCC said prosecutions for deposit offences almost doubled in 2025 compared with 2024. In Maryborough, one man took a 50% deposit, and was eventually fined $11,000 and ordered to pay the owner $12,474.55 in compensation.

Before you pay a deposit, do these three things

Before you pay a deposit

You can see finished projects in Greenslopes on SeeBuilds: https://seebuilds.com/au/zh/qld/greenslopes

We've connected each state government's licensing and contract rules to a free little tool, hometradie.com. Tell it in plain English what job you need done and which state the property is in, and it'll tell you whether that job legally needs a licence in that state, and which items the quote and contract should spell out.

So, one last time: a deposit buys you a spot in the schedule. Never let the money run ahead of the work.


Data note: every policy figure and case fact in this article was re-checked against official state government websites on 2026-10-13. Greenslopes case (concreting quote of $8,350 on 2 September 2020; $3,350 deposit paid the same day; no work done and no refund; owners complained to the QBCC; guilty plea in the Brisbane District Court on 25 January 2024; fine of $15,000; compensation to the owners of $3,350; if not paid by 24 July 2024, required to show cause why a three-month prison term should not be enforced; first person in Queensland to face possible imprisonment under the escalating penalty system) — from the QBCC news item "Conviction, $15,000 fine and threat of jail for recidivist unlicensed concreter". The charge in that case was unlicensed building work; "roughly four times the limit" is our calculation under Queensland's deposit rules. Tinana, Maryborough case (50% deposit taken; fine of $11,000; compensation to the owner of $12,474.55) — from the QBCC news item "Unlicensed builder convicted and ordered to pay home owner compensation" (19 March 2025). Deposit offence prosecutions almost doubling in 2025 compared with 2024 — from the QBCC news item "Unlawful building work prosecutions in Moreton Bay" (17 February 2026). NSW: maximum deposit 10%; where HBC cover is required, no deposit or other payment until cover is taken out and the certificate given; contracts over $20,000 must have a progress payment schedule and progress payments must match work done — NSW Government "Contracts for residential building work"; HBCF insurance applying to work over $20,000 is covered in the first article in this series. Queensland: deposit tiers of 20% / 10% / 5% and the exception of up to 20% where off-site work is more than 50% of the price; excess not recoverable in a Queensland Home Warranty Scheme claim for refund of deposit; progress payments relative to work completed (no more than half the price, including the deposit, until half the work is done) — QBCC "Deposits and progress payments". Victoria: deposits of 10% / 5%; over $16,000, policy and certificate of currency before taking a deposit; stage payment limits for a contract covering all stages of 10% / 15% / 35% / 25% — Consumer Affairs Victoria "Deposits and payments for domestic building"; amendment passed on 11 September 2025, deposit limits can be set in regulations, new laws to take effect by 1 December 2026, current rules unchanged for now — Consumer Affairs Victoria "New domestic building contract laws passed in Victoria". The $60,000 kitchen and bathroom renovation is an illustration calculated under the rules above. This article is not legal advice; for any specific project, consult a licensed professional.

Put this article to work:
· Check a licence number for free (against the government register, no sign-up)
· Describe your job in a sentence — we show whether it needs a licence in your state and what the quote should spell out
· Post your job and get a link for any tradie — they reply without signing up, and you read the reply in your own language